FCL 40ft and LCL to the US, Europe and the Middle East. Port pairs, transit times and every surcharge that stacks on a base rate, so you can negotiate instead of guessing.
CargoPass publishes a rate figure only with a named public source and an asOf date beside it. Sourced lanes live on /rates; anything else returns a request for a live quote.
$99 booking feeSecure checkout · $99 booking fee · Source URL: checkout.nanocorp.so/c/UEZNWllza0na1MPuO8Sv · asOf 2026-08-24 · CargoPass sources live options and coordinates one booking
Ocean freight · FCL (full container load)
40ft container (FEU) port pairs and transit times. Sourced rate figures live on /rates.
| Route | Port pair | Transit |
|---|---|---|
China → US West Coast (FCL 40ft) | SHA / SZX / NGB → LAX / SEA | 14–18 days |
China → US East Coast (FCL 40ft) | SHA / SZX → JFK / SAV / CHS | 28–35 days |
China → Europe (FCL 40ft) | SHA / SZX → RTM / HAM / FXT | 28–35 days |
China → Middle East (FCL 40ft) | SHA / SZX → DXB / JEA | 18–24 days |
CargoPass publishes a rate figure only with a named public source and an asOf date beside it. For the lanes that have one, see the lane library on /rates. A base freight number is never the all-in cost; the surcharges below stack on top.
Ocean freight · LCL (less-than-container load)
For shipments under ~15 CBM. Above 15 CBM, FCL economics typically win even with a partially filled container.
| Route | Transit |
|---|---|
| China → US West Coast | 18–24 days |
| China → US East Coast | 32–40 days |
| China → Europe (RTM/HAM) | 32–40 days |
| China → Middle East (DXB) | 22–28 days |
Market context · July 2026
Red Sea Disruption
The Houthi crisis has forced Asia-Europe routes around the Cape of Good Hope, adding 8–12 transit days and active surcharges. That tightens global vessel supply and lifts rates across all China trade lanes, not just Europe.
Peak Season Surcharge
Carriers apply a Peak Season Surcharge from July 1 through October for the summer pre-holiday surge. That is standard practice, so expect it through Q4 pre-stocking. Budget it into landed cost now.
US Tariff Front-Loading
Higher tariffs on Chinese goods have moderated baseline import volumes compared to 2024. However, possible tariff escalations trigger short-term demand surges as importers front-load inventory, creating sharp but temporary spot rate spikes.
Booking Lead Time Leverage
Booking 4–6 weeks ahead consistently beats last-minute spot. It is the highest-return lever a China importer has, and it costs nothing to do.
Bunker Adj. Factor (BAF)
Fuel surcharge, monthly
Terminal Handling (THC)
Charged at both ends
Peak Season Surcharge
July – October 2026
Port Congestion (PCS)
Applied selectively
Red Sea / Cape (Asia-EU)
Europe lanes only
Documentation / B/L
Per bill of lading
Related Rate Guides
Deep-dive on Trans-Pacific lanes: West Coast vs East Coast routing, air vs ocean comparison, and Q3 2026 outlook.
Analysis of West Coast vs East Coast routing economics, booking strategies, and H2 2026 outlook.
Forward-looking analysis of ocean rate trends heading into peak season.